CHICAGO O’HARE TERMINAL 5

2023

AIA Chicago Design Merit Award 2023

Design Development Construction Drawings Construction Administration

A multi-year project which delivered 11 new international boarding gates, lounges, and a control tower to one of the world’s busiest airports without disrupting service utilizing a phased temporary facility.

I worked on the design of all building connections, doors, and major areas of circulation. This was followed by over a year of on-site construction management with three different general contractors and CDA.

Team: Muller2 Architects | HOK Architecture